【Quality Wrenches】Made of premium chrome vanadium steel with mirror polish finish. Chrome plated for rust-resistance, heat treated for maximum strength and Drop-Forged for long lifespan. High quality wrench set exceeds ANSI standard.
【Half Moon Style】The half moon shape wrenches with curved design for maximum access in confined areas, such as the mounting or dismounting Parts in an automobile engine or in machinery, making your work more effortless.
【12 Points】The double 12-Point box end geometry is designed to grip flat sides of fastener heads, not corners, to prevent round-off and increase contact area and lock groove, easy application to the fastener.
【SAE Size】Two sizes per wrench provides more options with less to carry. Wrench sizes are stamped twice on both sides of handle for easier size identification: 5/16''x3/8'', 7/16''x1/2'', 9/16''x5/8'', 11/16''x3/4'', 13/16''x7/8''.
【EVA Foam Tool Organizer】The wrench set comes with a EVA Foam Tool Organizer for convenient storage. The wrench set comes with a EVA Foam Tool Organizer for convenient storage. Keeping wrenches in place for easy carry and take out.
Half Moon Box Wrench Set, Metric, 5-Piece
Features & Benefits :
Chrome vandium steel,chrome-plated
Top-grade industrial quality for the hardest of continuous use
Overloading indicated by deformation
High quality wrench SETS exceeds ANSI standard.
Maximum access in confined areas
Products Details
Specifications
Question & Answers
Item No. | Size(Metric) | Length(MM) | Wt | Qty/CTN |
---|---|---|---|---|
270 | 8*10 | 144 | 60 | |
271 | 11*13 | 168 | 108 | |
272 | 14*15 | 194 | 150 | |
273 | 17*19 | 240 | 250 | |
274 | 21*22 | 261 | 285 | |
8*10 | 5PC | DURATECH Half Moon Box Wrench Set, |
Q: What's your term of payment?
A:
In general, 30%deposit 70% balance before shipment for new customer.
Q: What's your warranty policy and certificate do you have?
A:
We have good quantity and will take fully responsible for the damaged products if caused by us
Q: What's the MOQ for the first order?
A:
At least 2000 for each type
Q: What's the lead time of the factory?
A:
The lead time is about 60-90 days after you place the order
Q: What's your sample policy?
A:
Samples are available in 3 working days. Also we can build the molds and fixtures if good quantity
RELATED PRODUCTS
0
Wish List