Site search
home > ALL PRODUCTS > Tool Sets > Ratchet Set > DTLFHRW06M BACK

Extra Long Flex-Head Double Box End Ratcheting Wrench Set, Metric

Features & Benefits :

Chrome vandium steel,chrome-plated 

Top-grade industrial quality for the hardest of continuous use 

Overloading indicated by deformation 

Drop-Forged with mirror polish 

Suitable for industrial and automotive applications.

Products Details
Specifications
Question & Answers
  • Extra Long Double Box end wrench set made of premium chrome vanadium steel, Heat treated for maximum strength, Lasting durability. DURATECH 6-Piece ratchet wrench set makes emergency repairs a breeze.

  • 72-tooth ratchet gear needs a minimum of 5 degree swing arc that is perfect for restricted, hard to reach work spaces 180 degree rotating flexible heads allow you to apply leverage at any desired angle and get around obstructions great for tight spaces design.

  • The unique ultra-long design can increase the torque, which is easier and more labor-saving than other box wrenches on the market.

  • 6 pieces High quality wrenches that exceeds ANSI standard includes: 8*9, 10*11, 12*13, 14*15, 16*18, 17*19 ratcheting wrenches. Suitable for industrial and automotive applications.

  • The wrench set comes with a premium roll-up pouch for easy organization and convenient storage, and the tailored cover keeps wrenches from sliding out. They roll up neatly in an organizer bag for storage in your car trunk or mechanics gear. Free replacement insures your DURATECH Wrenches purchase against manufacturer defects.


Item No.Size(Metric)Length(MM)Wt
0528*913140
05310*1115062
05412*13170102
05514*15190121
05616*18200164
05717*19231218
Q: What's your term of payment?
A:

In general, 30%deposit 70% balance before shipment for new customer.

Q: What's your warranty policy and certificate do you have?
A:

We have good quantity and will take fully responsible for the damaged products if caused by us

Q: What's the MOQ for the first order?
A:

At least 2000 for each type

Q: What's the lead time of the factory?
A:

The lead time is about 60-90 days after you place the order

Q: What's your sample policy?
A:

Samples are available in 3 working days. Also we can build the molds and fixtures if good quantity

0

Wish List